Engineering Services | 2016 | Pasir Gudang, Malaysia

Project Overview

In 2016 BlueConnect was awarded a turnkey contract to equip two sister Jack-up platform vessels at the Pasir Gudang yard. Our team designed, installed, integrated and commissioned all bridge- and accommodation-systems before hand-over later that same year.

Client

Malaysia Marine & Heavy Engineering (Pasir Gudang) on behalf of a leading offshore oil & gas operator

Scope

  • Factory acceptance testing (FAT) of all equipment

  • Full installation, integration & calibration onboard both sister platforms

  • Sea trials & classification-grade acceptance

  • Crew training & documentation hand-over
    Systems commissioned: Navigation · Communications · TVRO · CCTV · Nurse-Call

Duration

All works—including design, installation, testing and training—were carried out in 2016, with both platforms delivered to the client before year-end.

Technologies

Navigation Systems · Communication Systems · TVRO System · CCTV System · Nurse-Call System